Project

Penggantian Panel Listrik DB – STP di Senayan City Mall

PROJECT 2023 • SENAYAN CITY MALL

Penggantian Panel Listrik DB – STP di Senayan City Mall pada 2023

PT Sarana Energi Investama dipercaya kembali oleh Senayan City Mall, kawasan Senayan, Jakarta, untuk melakukan penggantian Panel Listrik DB – STP sebagai bagian dari kebutuhan sistem kelistrikan fasilitas.

2023 Tahun Project
DB – STP Panel Listrik
Senayan Jakarta
SEI Panel Division
Penggantian Panel Listrik DB STP Senayan City Mall Jakarta 2023
Penggantian Panel Listrik DB – STP di Senayan City Mall pada tahun 2023.

Penggantian Panel Listrik DB – STP di Senayan City Mall

Divisi Panel Listrik PT Sarana Energi Investama kembali dipercaya oleh Senayan City Mall di kawasan Senayan, Jakarta, untuk menangani pekerjaan penggantian Panel Listrik DB – STP.

Project ini mencakup penyediaan panel beserta berbagai komponen pendukung sistem distribusi dan kontrol kelistrikan sesuai dengan kebutuhan fasilitas.

Supply Panel Listrik STP – Mall Senayan City

Pekerjaan ini menjadi bagian dari pengalaman PT Sarana Energi Investama dalam mendukung kebutuhan panel listrik pada bangunan komersial, khususnya untuk kebutuhan distribusi dan fasilitas pendukung gedung.

Spesifikasi Material Panel Listrik

Berikut merupakan spesifikasi material yang digunakan dalam pekerjaan penggantian Panel Listrik DB – STP di Senayan City Mall:

No. Uraian Material Spesifikasi Merk
1 Box Panel Ukuran 1500 × 800 × 2000 mm, tebal plat 1.8 mm, 2 daun pintu Lokal
2 MCCB 3 Phase, 200A, 36kA Schneider
3 MCCB 3 Phase, 80A, 16kA Schneider
4 MCCB 3 Phase, 50A, 16kA Schneider
5 MCB 3 Phase, 16A, 6kA Schneider
6 MCB 1 Phase, 16A, 4.5kA Schneider
7 MCB 1 Phase, 10A, 4.5kA Schneider
8 MCB 1 Phase, 4A, 4.5kA Schneider
9 Inverter ATV610D37NA, 37 kW / 50 HP Schneider
10 Lampu Panel TL LED Tube 8 Watt Philips
11 Exhaust Fan FV25TGU2 Panasonic
12 Relay LY2-MY4 Omron
13 Power Meter PM2210 Schneider
14 CT 40 GAE
15 Kabel NYAF, NYY Supreme

Komponen Utama dalam Panel DB – STP

01

MCCB & MCB

Panel dilengkapi perangkat proteksi MCCB dan MCB dengan beberapa rating arus untuk mendukung pembagian serta perlindungan sirkuit listrik.

02

Inverter 37 kW

Menggunakan inverter Schneider ATV610D37NA dengan kapasitas 37 kW atau 50 HP sebagai salah satu komponen pada sistem panel.

03

Power Meter

Power meter Schneider PM2210 menjadi bagian dari panel untuk kebutuhan pengukuran parameter kelistrikan.

04

Relay & CT

Panel juga dilengkapi relay Omron serta CT sebagai bagian dari komponen pendukung sistem kelistrikan.

Lingkup Supply Panel Listrik

Box panel sesuai ukuran dan konstruksi project
MCCB dan MCB sebagai perangkat proteksi
Inverter Schneider ATV610D37NA 37 kW
Power meter Schneider PM2210
Relay Omron LY2-MY4
Lampu panel dan exhaust fan
CT dan kabel NYAF/NYY
Supply panel untuk kebutuhan DB – STP

Detail Project Senayan City Mall – 2023

Project Penggantian Panel Listrik DB – STP
Client / Site Senayan City Mall
Lokasi Senayan, Jakarta
Tahun 2023
Scope Supply / Penggantian Panel Listrik DB – STP
Divisi Panel Listrik – PT Sarana Energi Investama

Pengalaman SEI dalam Pengadaan Panel Listrik

Pengalaman dalam berbagai project bangunan komersial dan fasilitas industri menjadi salah satu dasar PT Sarana Energi Investama dalam mendukung kebutuhan sistem kelistrikan pelanggan.

Fokus layanan SEI mencakup pengadaan panel listrik baru, maintenance kelistrikan dan HVAC, retrofit, hingga audit energi. Dengan pengalaman tersebut, SEI siap menjadi partner untuk mendukung kebutuhan gedung dan fasilitas Anda.

Butuh Membuat atau Mengganti Panel Listrik?

Jangan ragu untuk menghubungi PT Sarana Energi Investama. Kami siap menjadi partner dalam pengadaan panel listrik, maintenance kelistrikan-HVAC, retrofit, dan audit energi untuk mendukung kebutuhan gedung maupun fasilitas Anda.

Contact – Panel-Listrik.id
PROJECT 2023 • SENAYAN CITY MALL

DB – STP Electrical Panel Replacement at Senayan City Mall in 2023

PT Sarana Energi Investama was once again trusted by Senayan City Mall in the Senayan area of Jakarta to carry out the replacement of the DB – STP Electrical Panel as part of the facility’s electrical system requirements.

2023 Project Year
DB – STP Electrical Panel
Senayan Jakarta
SEI Panel Division
DB STP Electrical Panel Replacement at Senayan City Mall Jakarta 2023
DB – STP Electrical Panel Replacement at Senayan City Mall in 2023.

DB – STP Electrical Panel Replacement at Senayan City Mall

The Electrical Panel Division of PT Sarana Energi Investama was once again trusted by Senayan City Mall in the Senayan area of Jakarta to carry out the replacement of the DB – STP Electrical Panel.

The project included the supply of the electrical panel and various supporting components for the facility’s electrical distribution and control requirements.

STP Electrical Panel Supply – Senayan City Mall

This project reflects PT Sarana Energi Investama’s experience in supporting electrical panel requirements for commercial buildings, particularly for electrical distribution and supporting facility systems.

Electrical Panel Material Specifications

The following materials and specifications were included in the DB – STP Electrical Panel replacement project at Senayan City Mall:

No. Material Specification Brand
1 Panel Box 1500 × 800 × 2000 mm, 1.8 mm plate thickness, 2 doors Local
2 MCCB 3 Phase, 200A, 36kA Schneider
3 MCCB 3 Phase, 80A, 16kA Schneider
4 MCCB 3 Phase, 50A, 16kA Schneider
5 MCB 3 Phase, 16A, 6kA Schneider
6 MCB 1 Phase, 16A, 4.5kA Schneider
7 MCB 1 Phase, 10A, 4.5kA Schneider
8 MCB 1 Phase, 4A, 4.5kA Schneider
9 Inverter ATV610D37NA, 37 kW / 50 HP Schneider
10 Panel TL LED Tube Light 8 Watt Philips
11 Exhaust Fan FV25TGU2 Panasonic
12 Relay LY2-MY4 Omron
13 Power Meter PM2210 Schneider
14 CT 40 GAE
15 Cable NYAF, NYY Supreme

Key Components of the DB – STP Electrical Panel

01

MCCB & MCB

The panel is equipped with MCCB and MCB protection devices with various current ratings to support circuit distribution and protection.

02

37 kW Inverter

The panel uses a Schneider ATV610D37NA inverter rated at 37 kW or 50 HP as one of the system components.

03

Power Meter

The Schneider PM2210 power meter is included as part of the panel for electrical parameter measurement requirements.

04

Relay & CT

The panel is also equipped with an Omron relay and CT as supporting components of the electrical system.

Electrical Panel Supply Scope

Panel box according to project dimensions and construction
MCCB and MCB protection devices
Schneider ATV610D37NA 37 kW inverter
Schneider PM2210 power meter
Omron LY2-MY4 relay
Panel light and exhaust fan
CT and NYAF/NYY cables
Electrical panel supply for DB – STP requirements

Senayan City Mall Project Details – 2023

Project DB – STP Electrical Panel Replacement
Client / Site Senayan City Mall
Location Senayan, Jakarta
Year 2023
Scope Supply / Replacement of DB – STP Electrical Panel
Division Electrical Panel – PT Sarana Energi Investama

SEI Experience in Electrical Panel Supply

Experience across various commercial buildings and industrial facilities is one of PT Sarana Energi Investama’s strengths in supporting customers’ electrical system requirements.

SEI’s services include new electrical panel procurement, electrical and HVAC maintenance, retrofit projects, and energy audits. With this experience, SEI is ready to become your partner in supporting building and facility requirements.